Scope is locked at week 2.
After discovery and information architecture sign-off, the build scope is fixed. Change requests are scoped separately, costed transparently, never absorbed quietly.
—— How we work
Five phases. Fixed scope, fixed timeline, weekly visibility, a a thorough launch process. The whole engagement is structured so you always know what happens next — and exactly what we are delivering when.
— Principles
After discovery and information architecture sign-off, the build scope is fixed. Change requests are scoped separately, costed transparently, never absorbed quietly.
Every Friday: what shipped, what is in flight, what we need from you. No status meetings unless we have a real decision to make.
72 hours before go-live, we run the entire site through a comprehensive checklist on staging, with you watching. Nothing is ticked behind a curtain.
A structured intake that ends with a written brief. We map your audiences, conversion goals, technical constraints, and the SEO terrain you are entering. No design before this is signed off.
A sitemap that reflects how real users search, not how the org chart looks. We finalise URL structure, internal-link graph, and the content model that the CMS will mirror.
Component-first design in Figma, anchored to a real type and color system. Every screen ships with mobile, tablet, and breakpoint variants — no afterthought responsive.
In Wix Studio with Velo where logic is needed. We hand-build components, set up the CMS, write the schema, and bake performance budgets in — not bolt them on later.
A monitored launch followed by a 30-day stabilisation cycle and optional retainer. We watch CWV, ranking, and form conversion live, and ship adjustments inside the first month.
Most engagements start with a 30-minute call to confirm fit and timeline. We will email you a discovery brief template within the day.
—— start a project